
This was project revolved around the addition of explosion venting to an existing dust collection baghouse. First a pressure rating was developed with extensive finite element analysis. When this was not enough to allow the explosion vents to function adequately, reinforcement was designed to allow for an increase in the pressure rating. The reinforcement had to be design to avoid in place welding as well as fitting into the existing installation.
